Before you order a replacement conveyor leveling foot, check the tube end and threaded fitting, the stem’s thread diameter and pitch, the required height from the floor to the foot’s mounting face, and the pad size and anchor holes. Set the target height at the top of the belt or rollers at the handoff. The foot needs enough thread engaged at that height, and the assembled support must carry the load at that leg.

Match the Insert and Thread
Check whether the stem screws into a tube insert or a threaded fitting built into the stand. Before loosening a load-bearing part, have authorized personnel follow the site’s energy-control procedure, verify isolation and secure the frame on independent supports as required by the equipment maintenance procedure. For covered work in the U.S., OSHA’s lockout/tagout standard sets the energy-control requirements.
At the insert seat, measure a square tube across its flats or a round tube across its outside diameter. If you’re replacing the insert, also measure the tube opening and wall thickness at the seat. Once the old foot is safely removed, measure the stem across the thread crests with calipers. Use a thread pitch gauge to check the pitch in millimeters or the threads per inch (TPI).
A 5/8-11 UNC stem and an M16 × 2.0 stem are close in diameter. The UNC thread has 11 threads per inch, or about 2.31 mm between crests. The metric example has a 2.0 mm pitch. To estimate pitch with calipers, measure along the stem from the first full crest to the eleventh and divide by ten. Match the diameter and pitch to the mating thread or part specification before fitting the replacement.
The 403 insert fits a square tube 50 mm across the flats. The 404 fits a round tube with a 50.8 mm outside diameter. Both have an M16 thread. Check the shape and seating dimensions at the tube end to choose the insert, then confirm that its thread matches the stem. For a 403 or 404 quote, include the part number or your tube dimensions. If the stand also needs replacing, compare its upright and foot connections with the 301–305 conveyor support bases.
Calculate the Required Foot Height
Set the target height at the infeed and discharge using the top of the belt (TOB) or top of the rollers (TOR) as the reference. Use a level or laser to mark the target elevation at each support. Follow the specified slope on an inclined section. Measure the vertical distance from the conveying surface to the face where the stem enters the insert or bracket. For a flanged insert, use the exposed face of the flange with the insert seated. Subtract that distance from the target height above the floor at the same support to find the required installed height. When two conveyors meet, check the gap and height difference at the handoff as well.
If the conveying surface needs to be 900 mm above the floor at one support and the mounting face sits 830 mm below that surface, the foot needs to fill a 70 mm gap. Check that 70 mm falls within the adjustment range of the assembled foot and insert. At that setting, the stem needs the specified thread engagement without bottoming out. Leave enough room for a wrench if there’s a locknut. Give the required installed height and the stem length separately when ordering.
On a 205 foot, stem length (L) runs from the top of the hex collar to the stem tip. The ball joint sits below the collar, above the rubber-backed base. Record base height (H) separately.

Check the Pad, Anchors and Load
Measure the pad diameter or trace its outline, then check its clearance from nearby equipment. For an anchored pad, record the hole diameters and center-to-center spacing. Verify that the new pad lines up with the planned anchor locations and leaves room for the fasteners. A fixed pad needs a floor angle that matches its seating face. An articulated pad swivels to meet the slope within its specified range. Choose a foot that sits flat at the required height.
On a dry line, a nylon pad with a carbon steel stem is one option. For washdown, match the stainless steel grade and pad material to the cleaning chemicals and temperature. If the floor is slick or vibration can move the foot, check whether a slip-resistant rubber pad or floor anchors suit the installation.
On a model 205 foot, an 80 mm pad extends 10 mm farther from the stem centerline than a 60 mm pad when both sit flat and centered. Check that extra space against nearby equipment, floor channels and anchor positions. With an M16 thread and a stem length (L) of 100 mm, the published static load ratings are 1,000 kg per foot for the 60 mm version and 1,500 kg per foot for the 80 mm version. For a 205 quote, include the part number or the stem and pad dimensions.
If you’re comparing pad styles, the leveling foot range includes the SJ-201 fixed foot and the 202 and 203 articulated feet.
Check the load at each support, including concentrated loads from drives or accumulated product, side loads and dynamic forces. Compare those loads with the limits of the whole support assembly, including the stem, insert, stand, base and any anchors.
What to Send When Ordering
Send these measurements to the buyer or engineer for each support you’re working on.
- Tube and insert. Tube shape, outside size and insert type. If you’re replacing the insert, include the tube opening and wall thickness.
- Stem. Thread diameter, pitch in millimeters or threads per inch, and stem length.
- Heights. Target conveying height, distance from the conveying surface to the mounting face, and required height from the floor to that face.
- Pad and anchoring. Pad dimensions, floor slope and any anchor hole diameters and center-to-center spacing.
- Load and floor conditions. Record the load at that support. Note any washdown chemicals and temperature, slippery floors or vibration that affect pad or anchor selection.
- Side photo. Show the floor, mounting face and conveying surface in the same shot.
If you’re replacing the whole stand, include the frame mounting dimensions and hole pattern. If the job also converts a flat belt to modular belting, use the retrofit guide to check which parts can stay.