You can keep the frame and legs if they can carry the new loads and have room for the new belt path. The shafts and bearings can stay if their fit, alignment and load capacity check out. Keep the motor and reducer if they can deliver the required belt speed and torque, including under a loaded start. Replace the old drive pulley with sprockets matched to the modular plastic belt. Check the carryway supports, return supports, transfer plates and side guides against the new belt path before deciding which of those parts can stay.

Check the Frame Against the New Belt Path
Start with the frame drawing or sketch a side view of the existing conveyor. Before opening guards or taking hands-on measurements, have authorized personnel follow the site’s energy-control procedure, secure stored energy such as belt tension and verify isolation. Record the clear width between the frame sides, the shaft centerlines and the elevations of both belt runs. Compare them with the proposed belt path, its supports and its guard layout. Inspect the frame, legs and mounting points for damage or distortion. Use the new belt and support weights, the expected product load and the operating conditions to verify the frame and its supports can handle the new loads. If the layout requires moving a bearing mount, include the new mounting point in that check.
Decide Which Drive Parts Can Stay
The old drive pulley moved the flat belt by friction. For the modular belt, select drive sprockets that engage the chosen belt series. To reuse a drive shaft, check the sprocket bore shape and size, how torque is transmitted and how the sprockets are positioned along the shaft. Check that the existing shaft and bearings can carry the new loads and maintain alignment. Use the selected sprocket and target belt speed to determine the speed required at the sprocket shaft. Use the new belt pull and loaded-start conditions to determine the torque required at that shaft. Check what the existing motor and reducer can deliver at the sprocket shaft, accounting for any intermediate gearing and drivetrain losses. The conveyor sprocket selection guide covers bore and shaft details, and the modular belt conveyor design guide covers the drive calculation inputs.
On the same shaft centerline, the bare 24-tooth sprocket for the CSTRANS 1902 flat-top belt reaches 12.4 mm farther out at the tooth tips than the bare 20-tooth sprocket. Both are for the 19.05 mm pitch belt and have a nominal 30 mm bore option. Their outside diameters are 147.6 mm and 122.8 mm, so the radial difference is (147.6 − 122.8) ÷ 2. Check that extra space beside the guard and crossmembers. Use the assembly drawing to check the full space occupied by the moving belt as it goes around the sprocket and the clearance to the guard and frame.
Compare the Carryway and Return Paths
Trace both belt runs on the side view. On the carryway, compare the existing deck or wear strips with the support spacing and contact locations specified for the selected modules. A deck that supported the flat belt may be reusable if its material, surface condition and support layout suit the new belt. On the return, check what actually touches the supports. Use the belt underside shown on the module drawing and include any attachments that project from the conveying face as the belt comes back. Check the space under crossmembers and compare each point where the belt bends backwards with the belt maker’s minimum backflex radius. Mark where the available space or support layout needs to change before deciding which parts can stay.
Recheck the Infeed and Discharge Heights
At both ends of the converted section, mark the current and proposed conveying-surface heights and measure the gaps to the adjoining equipment. Use the new belt’s running surface as the reference when checking whether the old transfer plate will fit and whether each side guide will still meet the product at the right height. Check how products with the smallest or least stable contact footprint cross each handoff. Note where they could lose support or catch on an edge. If the height, gap or guide position needs to change, update the transfer drawing before deciding which parts to order. Use the conveyor transfer guide to choose the handoff arrangement. Follow the modular belt installation and first-run checks during installation and before returning the conveyor to service.

Record What Stays Before Ordering
Mark each part to keep, adapt or replace on the side view. Send engineering and purchasing the frame width, shaft center locations, and bore and shaft details. List the proposed belt series and sprocket part number or tooth count, and flag any selection still open. Include the carryway and return support positions, available clearances, and the running-surface heights and gaps at both transfers. Include the target belt speed, expected product load and a photo of the motor and reducer nameplates or their specifications. Add close-up photos of the drive and transfers so the team can match each measurement to the part it describes.
